National Grid Electricity Distribution Anmeldelser 

123
TrustScore 3 ud af 5

3,0

Selvom vi ikke verificerer specifikke påstande, fordi anmeldernes meninger er deres egne, kan vi godt betegne anmeldelser som "Verificerede", når vi kan bekræfte, at der har fundet en forretningsinteraktion sted. Læs mere

Af hensyn til platformsintegriteten scannes alle anmeldelser på vores platform – verificerede eller ej – af vores automatiserede software døgnet rundt. Denne teknologi er designet til at identificere og fjerne indhold, der overtræder vores retningslinjer, herunder anmeldelser, som ikke er baseret på en reel oplevelse. Vi er klar over, at vi måske ikke fanger alle problemer, og du er velkommen til at gøre os opmærksom på det, hvis vi har overset noget. Læs mere

Se, hvad kunderne siger

Bedømt til 5 ud af 5 stjerner

My power we t off 9.00pm last night. I am a registered disabled customer. I spoke to Michelle and she was amazing, putting me at ease. Within an hour Michael arrived he was great. A generator a... Se mere

Bedømt til 5 ud af 5 stjerner

We had a problem with an EV charger. Called National Grid and within an hour an engineer came and assessed the issue. He then arranged for a repair which was done almost immediately. Can't fault... Se mere

Bedømt til 1 ud af 5 stjerner

I was without power for 14 hours straight and was told I would get compensation I've just had an email saying you had power in-between the 14 hours for a short time so no compensation. As we live on... Se mere

Virksomheden har svaret

Bedømt til 1 ud af 5 stjerner

Sick and tired of power cuts every few weeks in Pinxton Nottingham. It’s very frustrating that national grid knows there’s a problem under ground yet keep patching it up. No support in place they are... Se mere

Virksomheden har svaret

Virksomhedsoplysninger

  1. Elselskab
  2. Transformatorstation

Skrevet af virksomheden

National Grid Electricity Distribution is the regional electricity distribution division of National Grid. Formerly known as Western Power Distribution, the UK’s largest electricity distribution network serves nearly 8 million customers in the East and West Midlands, South West and Wales, delivering essential power to millions of homes and businesses across its regions. With a distribution area of 55,000 square kilometres, its 6,500 colleagues are committed to providing a safe, stable and reliable electricity supply and ensuring the highest quality of customer service.


Kontaktoplysninger

3,0

Middel

TrustScore 3 ud af 5

123 anmeldelser

5 stjerner
4 stjerner
3 stjerner
2 stjerner
1 stjerne

Ingen nylige anmeldelsesinvitationer

Denne virksomhed har ikke inviteret kunder til at skrive anmeldelser for nylig, så anmeldelserne er muligvis ikke repræsentative

Har besvaret 66 % af deres negative anmeldelser

Svarer typisk inden for 2 uger

Sådan bruger denne virksomhed Trustpilot

Se, hvordan deres anmeldelser og bedømmelser indsamles, vurderes og modereres.

3,0

Alle anmeldelser

(123)

40 anmeldelser inden for de sidste 12 måneder

Skriv en anmeldelse
Virksomheder på Trustpilot må ikke tilbyde incitamenter eller betale for at skjule anmeldelser. Anmeldelser repræsenterer individuelle brugeres meninger, og ikke Trustpilots mening. Læs mere

Bedømt til 5 ud af 5 stjerner

Amazing service

Amazing service, call them and report power cut they send me message with all details, it was fixed in around 40min ,they call me on end ask is the services come back to normal.

7. juli 2026
Uopfordret anmeldelse
Bedømt til 5 ud af 5 stjerner

Excellent we t off 9.00pm last night

My power we t off 9.00pm last night. I am a registered disabled customer. I spoke to Michelle and she was amazing, putting me at ease. Within an hour Michael arrived he was great. A generator arrived at midnight. First thing ghe following day Ross and Chris solved the problem and the generator was removed.
As someone on their own this was a first class solution to a worrying issue
Thank you so much
Kind regards
R Duncan

3. juli 2026
Uopfordret anmeldelse
Bedømt til 1 ud af 5 stjerner

I am absolutely appalled by this situation

I am absolutely appalled by the gross negligence and complete lack of care shown by National Grid Electricity Distribution tonight in Forest Fields, Nottingham. Today, a crew dug a massive utility trench directly across my front boundary and then abandoned the site for the night. They failed to install mandatory pedestrian crossing plates, completely trapping us outside and cutting off all safe access to our home.I called their emergency line at 17:10 PM to report the blocked access. They ignored it and nobody came. At 10:02 pm, I returned home in the pitch black at 38-weeks pregnant and with two young children (aged 6 and 9). Because National Grid left an unlit, open excavation hazard outside our front door, we were forced to trespass and climb through a neighbor's property in the dark just to get inside our own house. Leaving a heavily pregnant woman and young children stranded on the street with zero emergency service access is a massive breach of street works safety regulations. National Grid UK – I want a senior network manager to contact me immediately tomorrow morning, make this site safe for my family to leave for school, and formally address this severe breach of your duty of care.

23. juni 2026
Uopfordret anmeldelse
Bedømt til 1 ud af 5 stjerner

Horrible company

Horrible company. Not connecting 6 new builds to the network and making it process time consuming for no apparent reason. Application was made last November 25. Mortgage offers expiring, peoples rent contracts expiring but there not bothered, just delaying and delaying. When somebody from National Grid came to look at the site they said everything was fine and set the date for 1st May which never happened.

4. juni 2026
Uopfordret anmeldelse
National Grid Electricity Distribution-logo

Besvarelse fra National Grid Electricity Distribution

Thank you for sharing your experience. I've sent a request for a little more information, so we can help with your connections.

Bedømt til 1 ud af 5 stjerner

I was without power for 14 hours…

I was without power for 14 hours straight and was told I would get compensation I've just had an email saying you had power in-between the 14 hours for a short time so no compensation. As we live on a park home site others got some power I did not.
Absolutely disgusting service.

22. maj 2026
Uopfordret anmeldelse
National Grid Electricity Distribution-logo

Besvarelse fra National Grid Electricity Distribution

Thank you for your feedback, I've sent a request for further information so we can look into this a little closer. Thanks Simon

Bedømt til 1 ud af 5 stjerner

Another power cut

Another power cut! These outages are becoming more or less frequent and are now causing disruption to daily life. I would like a clear explanation of why these regular power cuts are occurring and what is being done to resolve the problem permanently.
Given the frequency of these interruptions, it's difficult not to question whether they are connected to the Chesterfield to Willington project. If there is no connection, please clarify the cause of these outages and provide a timeline for when residents can expect a RELIABLE electricity supply to be restored!

4. juni 2026
Uopfordret anmeldelse
National Grid Electricity Distribution-logo

Besvarelse fra National Grid Electricity Distribution

Hello - thanks for sharing. I've requested further information so we can review these outages for you. Thanks Simon

Bedømt til 1 ud af 5 stjerner

Another public service body that just…

Another public service body that just lies to public rather than accept any responsibility. I had a break in my power supply. Did not take much notice as it only lasted a couple of seconds. However when it happened again a few minutes later I contacted the helpline and was informed that there was work being done, not in my direct area but It could cause disruption to my supply. I have this conversation recorded. I was also told that this work would be ongoing until 5pm the following day. It did, I had 5 breaks in my power supply. After 5pm I turned on my ps5 to be greeted with a message saying "The ps5 was not shut down correctly" was playing it when the power cut out. I then discovered that this incorrect shutdown had corrupted my plug in extended hard drive causing me to lose nearly £350 worth of stored games. I contacted the National grid to seek compensation as no warning was given out of possible power breaks. Guess what they lied, denied everything they told me before and refused to accept any responsibilty. Absolutely disgusted by their response.

12. februar 2026
Uopfordret anmeldelse
Bedømt til 5 ud af 5 stjerner

An outstanding service.

Had a power cut in our area today. Able to see up to date progress via their website site and, because I'm disabled and classed as vulnerable, received a call from them to see if I was OK! An outstanding service, thank you.

26. april 2026
Uopfordret anmeldelse
National Grid Electricity Distribution-logo

Besvarelse fra National Grid Electricity Distribution

We're happy to hear that you were able to see updates on our website and that we checked-in with you during the power cut. Thank you for your positive feedback.

Bedømt til 1 ud af 5 stjerner

ANTI SOCIAL BEHAVIOUR

Your large commercial vehicles with all their overhanging commercial kit etc should not be left on our streets. We are in a residential family area close to a school with children , pets, dog walkers, cyclists and cars. You have a social responsibility to ensure your employees do not leave your vehicles on our streets when not in use. On one occasion I did not see this vehicle move for a whole week! I do not see any other corporate commercial vehicles on the street, only a large national grid vehicle parked anti socially - Get this vehicle off the street - postcode is b60 1jz - this vehicle is also left on a steep hill- your the supposed professionals so will leave you to assess all the above risks! And anti social behaviour..

20. april 2026
Uopfordret anmeldelse
Bedømt til 1 ud af 5 stjerner

A laughable extravaganza that rewards flawed sapiens

National grid fail to inform us via post of works intended.
We become aware when the platoon of vehicles arrive at our neighbours property, to commence work
We switch of our electric consumer unit no attempt is made by any member of the national grid troop to inform us, the platoon made up of Friday's workers complete the works at the neighbours early & stand about looking bemused with a pinch of being totally dumbfounded.
However due to the national grid fleet vehicles fitted with trackers, they are aware they cannot leave the job early so to ease there boredom
They stand around looking for the meaning of life for almost 2 hours "NICE" then one van and man has the
Exhausting task of pressing the connect electric now
& then the national grid platoon exit all areas in there vehicles in a cloud of dust generated by there haste and the alloted 2pm job invoice finish time that equates to the vehicles tracking devices " all good send it"
We switch are electric consumer until back on, no national grid member obviously has the energy to walk the 15 metres to our chapel to inform us the "electricity is back on"
"THIS IS WHAT PUT THE GREAT
INTO GREAT BRITAIN"

Prior to receiving your standard
Reply " that always states sorry on this occasion you felt we did not meet our usual high standard's"

Let me say if your troop had supplied me with pop corn & ice cream I would have enjoyed the circus" I missed not seeing any elephants" but the clowns did not disappoint and they all dressed the same superb 👌👌👌

I would like to publicly take this opportunity to thank
ADELE MANN “ team leader customer complaints
Customer excellence national grid

Who yesterday made time to phone me and discuss
The total failure of the nation grid & it’s intimidating
Bullying practice with customers who the national grid serve .
& particularly the Lincoln team leaders failure on all levels
Particularly threatening to have our electricity turned off ,should we fail to comply
With having a steel fork / service bracket bolted onto our external chapel roof line to attach the service cable “ therefore allowing the service cable to bypass the pole that’s already in the neighbours garden
To allow them to continue landscaping there rear garden after national grid remove the already functioning pole that our updated connections from our chapel had been renewed and signed off as safe and correct the year prior
This together with the total lack of respect given to ourselves is scandalous my wife a committed NHS nurse who retired after suffering a heart attack
Was understandably stressed
And no thoughts given to a building covered by the planning department as a building of importance .
Meant absolutely nothing to the team leader
I’m fortunate in being not frail myself and standing toe to toe with the intimidation directed at ourselves .

Adele Mann
Was understandably shocked while I related this horror story & promised to take action with the offending nation grid employees who as she said
“Do not represent the nation grid whatsoever “
I was offered an apology from the nation grid and its total failure .”apology not wanted a RECOMPENSE would be appropriate given the circumstance.
I hope ADELE MANN
ACTS on this intimidation/ bullying tactics
& offers constructive seminars on how to communicate with customers together with actually sending via post proposed dates of works to be carried out
& obviously informing customers on the arrival day by knocking on the property door and informing the property owners there electric will be turned of at the time stated & when the electricity will be turned back on
I’m sure you’ll agree is essential
I do hope that the 1.2 hours ADELE MANN
spoke with me over this total failure with the national grid at LINCOLN its team leader and his team does not end when the phone conversation ended as I will be making waves

10. april 2026
Uopfordret anmeldelse
National Grid Electricity Distribution-logo

Besvarelse fra National Grid Electricity Distribution

Thank you for getting in touch and taking the time to share your experience. I am sorry to hear how frustrating this has been for you. I have sent you a request for further details so we can investigate this fully and follow up with the team involved. Thank you for your patience while we look into this.

Bedømt til 5 ud af 5 stjerner

Superb service and a quality fix.

After reporting a problem with a cable coming down into the ground which had a open cut in the outer insulation with the inside cable bare and open we rang for assistance and engineers came very quickly.
The two service engineers Barrie Brownrigg and Lewis Fitzgerald were magnificent, deciding how to sort the problem out and getting things done and getting the required parts from their base in Hereford to finish the job to their high standard of workmanship.
Credit to them they were great and so friendly...so well done National Grid.

1. marts 2026
Uopfordret anmeldelse
National Grid Electricity Distribution-logo

Besvarelse fra National Grid Electricity Distribution

We're happy to hear that our engineers responded quickly to resolve the cable issue. We appreciate your positive feedback regarding their expertise, efficiency, and friendly service. Thank you for recognising their high standard of workmanship. I will ensure your feedback reaches the individuals mentioned.

Bedømt til 1 ud af 5 stjerner

Vehicles on street for days - Anti social behaviour

Why do you allow your employees to leave large commercial vehicles parked on residential streets when not in use. These should be kept locked up safely in depots they not only block the roads to residents but are a risk to emergency vehicles who would struggle to get through. I also assume they all have expensive kit on board which is likely dangerous in the wrong hands. Please ensure your employees living in Bromsgrove do not leave your vehicles on our streets, as they are clearly not responsible enough to consider other road users, otherwise I will ensure images videos of these violations in action will be posted across your digital channels and reported to the Police.

Your reply is corporate BS do something about it this is anti social behaviour

3. april 2026
Uopfordret anmeldelse
National Grid Electricity Distribution-logo

Besvarelse fra National Grid Electricity Distribution

Thank you for bringing this parking issue to our attention. We take your concerns about road obstruction, emergency vehicle access, and equipment security seriously. We will investigate this situation in Bromsgrove and address it with our team. Thank you for your feedback.

Bedømt til 1 ud af 5 stjerner

What absolute liar said they have been…

What absolute liar said they have been working on the problem since 1.18 pm live in a small street can see both ends never turned up till 5.30 pm food cooked half way through this all happened the night B4 how do these rip off people get away with it ps because of how the web site works this happened over 2 days

29. marts 2026
Uopfordret anmeldelse
National Grid Electricity Distribution-logo

Besvarelse fra National Grid Electricity Distribution

Hello Chris,

I'm sorry to read about your experience with us.

I'd love to get some further information so i can help review this. I have sent a request through.

Thanks
Adele

Bedømt til 1 ud af 5 stjerner

So glad I don’t have an electric car as you can’t charge it up due to power failure AGAIN

What is the standing charge for. One of the richest countries in the world and yet we keep having power cuts.
Did Iran send a drone over and knock out one of this rotten countries power stations.
Why can’t we keep the lights on, why are we always having power cuts and why does no one care.
This is basic stuff, we pay these rotten companies enough money yet they keep on failing the public.
You never see a reduction in their rotten charges. No heating for the elderly, food going to waste in the fridge and freezer, kids having to go to school HUNGRY. you never get any compensation for your loss.
All the energy companies are truly shocking, profits before service. Time to re nationalise the power industry.
No power for over 10 rotten hours.
If we were to take money off their bills they would be up in arms.
GAS, WATER, ELECTRIC are basic things of life and should be NATIONALISED AGAIN.

4. marts 2026
Uopfordret anmeldelse
National Grid Electricity Distribution-logo

Besvarelse fra National Grid Electricity Distribution

Hi Chris,
Thanks for taking the time to share your concerns — even on a day when the lights quite literally weren’t shining. I’m really sorry to hear about the lengthy outage and the frustration it caused for you and your household. Ten hours without power is tough for anyone, and we fully appreciate the impact it has, especially on vulnerable customers and families.

The standing charge helps cover the constant, year-round cost of maintaining, upgrading, and repairing the network — the poles, wires, substations and engineers who keep the system running even when the kettle’s off. Not the most glamorous explanation, I know, but we promise there are no drones involved.

Power cuts can happen for a number of reasons — severe weather, third-party damage, or equipment faults — but what doesn’t change is that our teams work around the clock (and sometimes in some very questionable weather choices) to get power restored as quickly and safely as possible. No one here shrugs at a fault; be assured, our engineers dislike having their tea-time disrupted just as much as you dislike the power going out.

On compensation: depending on the cause and duration of an outage, you may be eligible under Ofgem’s Guaranteed Standards. If you get in touch with your postcode and details, we’ll happily check that for you and make sure nothing is missed.

We absolutely understand why you feel strongly about reliability, value and service. Your feedback genuinely helps us improve, so thank you again for raising it — even if it wasn’t under the brightest of circumstances.

If there’s anything we can look into for you personally (fault details, compensation, or advice on support services), please do drop us a message. We’re here to help get things back on track.

— The Team at National Grid

Bedømt til 5 ud af 5 stjerner

Excellent response after accidental power cut

At around 16:22 on Monday 23 February our electricity suddenly went off due to cables being accidentally struck during works in the area.
Although the initial loss of power was worrying — particularly as my 88-year-old mother relies on an electric nebuliser and we had no backup supply — the response from the team was very reassuring.
Rus and Carl, the engineers on site, were open about what had happened and explained they were already working on a secondary cable to restore the supply. They were calm, professional and clearly focused on getting the problem fixed quickly.
As a Priority Services customer I also received a text update and a follow-up call from the area manager, which was appreciated. Once power was restored the engineers even knocked on the door to check that we were okay. In this case the team responded responsibly and showed real consideration for vulnerable residents. Thank you to Rus, Carl and the wider team. The incident was in Shottery Stratford upon Avon it would be nice if the feedback could be passed onto the team.

23. februar 2026
Uopfordret anmeldelse
National Grid Electricity Distribution-logo

Besvarelse fra National Grid Electricity Distribution

Hi Catherine, thank you for sharing your experience. We're happy to hear that the team's response was reassuring and considerate, especially given the circumstances. It's good to know the text update and follow-up call were helpful too. We will definitely pass on your kind words to Rus, Carl and the teams involved. Its always uplifting for our teams when customers feedback such positive experiences - thank you!

Bedømt til 5 ud af 5 stjerner

Today we lost all electrical power to…

Today we lost all electrical power to our house, it is winter so no heating or lighting. A neighbour kindly suggested calling a private electrician to come out and sort the problem, but instead I called the National Grid emergency number, the operator answered quickly, gave me an order number to quote, and took my number just incase we got cut off. She then took my name address and said that an engineer would be with us asap, the engineer arrived within 30 minutes, he asked what the problem was, identified the cause, and got us back on the grid within 20 minutes. Both the operator and engineer were super efficient and very friendly, I really couldn't thank them enough. I was very impressed! Thank you.

16. februar 2026
Uopfordret anmeldelse
National Grid Electricity Distribution-logo

Besvarelse fra National Grid Electricity Distribution

Thank you so much for taking the time to leave this wonderful review. It's great to hear that our team was able to support you so quickly, especially during such a stressful situation with no power, heating, or lighting in the middle of winter.
Our emergency teams work hard to respond promptly and keep customers safe, so it’s great to know both the call handler and the engineer provided the friendly and efficient service you needed. I’ll make sure your kind feedback is passed on to them — it will mean a lot.
We’re glad we could get you back on supply so swiftly. If you ever need us again, we’re always here to help.
Thank you once again for your lovely comments.

Bedømt til 1 ud af 5 stjerner

Absolutely perthetic company

They have put a massive generator right outside our house I have a child with additional needs and he's been going mental all day/night when I rang to see if you can move it only to be replied with a lie saying that's the only place it go Evan know they only had to push the machine up to the desired position there engineer is lieing I have rang the council and it states it needs to be 15 to 20 foot away from a property but no the generator is 4 foot away from my window all you can smell is carbon monoxide in my house I told them I was gunna turn it off them only to be threatened with the police the company is a perthetic and need to be updated with children's needs

8. februar 2026
Uopfordret anmeldelse
National Grid Electricity Distribution-logo

Besvarelse fra National Grid Electricity Distribution

Thank you for sharing your feedback, and I’m very sorry to hear about the distress this situation caused you and your family. We understand how challenging generator noise and fumes can be, especially when supporting a child with additional needs.

Our teams aim to position generators as safely and considerately as possible while meeting operational and safety requirements, and I’m sorry that your experience left you feeling unheard and frustrated. The concerns you’ve described around communication and the impact on your household are taken seriously, and your comments will be shared with the relevant teams to help improve how we manage similar situations in future.

Thank you again for taking the time to highlight your experience.

Dette er Trustpilot

Alle kan skrive en anmeldelse på Trustpilot. En anmeldelse er ejet af personen, som har skrevet den, og vedkommende kan derfor redigere eller slette den til enhver tid. En brugers anmeldelser bliver vist, så længe vedkommendes konto er aktiv.

Virksomheder kan bede deres kunder skrive en anmeldelse ved hjælp af automatiske invitationer. Denne type anmeldelser handler om reelle oplevelser og markeres "Verificeret".

Læs mere om andre typer anmeldelser.

Vi bruger en kombination af dedikerede medarbejdere og avanceret teknologi til at beskytte vores platform. Find ud af, hvordan vi bekæmper falske anmeldelser.

Læs om anmeldelsesprocessen på Trustpilot.

Hér finder du 8 tips til at skrive anmeldelser.

Verificering kan være med til at sikre, at det er rigtige mennesker, der skriver de anmeldelser, du læser på Trustpilot.

Det kan påvirke TrustScoren, når man tilbyder incitamenter i bytte for anmeldelser, eller når man kun spørger bestemte kunder, og det er imod vores retningslinjer.

Læs mere